PV Powered 2500 Przewodnik Instalacji Strona 20

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 19
Electrical Connection SMA Solar Technology AG
20 SB25_30-IEN092520 Installation Guide
6. Lead the pressure screw and/or cable gland and socket tube via the AC cable.
7. Insert the protective earth PE (green-yellow) in the
screw terminal with the earth sign on the socket
element and tighten the screw.
8. Insert the neutral conductor N (blue) in the screw
terminal 1 on the socket and tighten the screw.
9. Place phase L (brown or black) into screw terminal
2 on the socket insert and tighten the screw.
10. Terminal 3 on the socket element remains unused.
11. Make sure the wires are securely connected.
Size used Procedure
PG13.5 •Push the sealing ring into
the fastening case.
Lead the pressure screw
PG13.5 and the
fastening case including
the sealing ring via the
AC cable.
Lead threaded sleeve
via the AC cable.
PG16 Lead the cable gland
PG16 via the AC cable.
Lead the threaded
sleeve via the AC cable.
Przeglądanie stron 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 51 52

Komentarze do niniejszej Instrukcji

Brak uwag